Yamaha YZF-R7 Forum banner
1 - 12 of 12 Posts

·
Registered
Joined
·
113 Posts
Discussion Starter · #1 ·
Robem Engineering Fairing Stay installed. Very high quality, everything lined up seamlessly and easy. Used the factory bolts, factory shroud, and stock cluster which is very nice. Huge weight savings from stock unit and a lot less sharp pretruding pointy things to impale me.
Matt at Roben Engineering shiped the Fairing stay quick and the install was quick was under 5 mins. I can not wait to install some of the other parts from Robem.
 

Attachments

·
Registered
Joined
·
113 Posts
Discussion Starter · #3 ·
Thanks a bunch for this, they have a few things I’ll be spending my not so spare money on now. 🤣
Matt at Robem makes some great stuff, always have.
 

·
Registered
Joined
·
113 Posts
Discussion Starter · #5 ·

·
Registered
Joined
·
266 Posts
Yes absolutely I have to... waiting on the GPR most likely eta Jan/Feb
I just talked to them, they said I am the only person who has brought it up with them. They have the design but are catching up on backorders of other mounts. I told them I'll put out again on forums, again, that if an interest is shown, they can start producing. Randy Norman; [email protected] - owner; Paul Dorrian; [email protected] - Shipping manager
 

·
Registered
Joined
·
266 Posts
I have the graves stabilizer mount and Ohlins 68mm dampener but I do like the GPR
I have multiple GPR's, I'd really just like the mount, it's three bolts to move it. LOL The problem is how the lever part connects, there is no exposed bolt or area to use, I am thinking it will be some sort of wrap around the top of the steering tube.
 

·
Registered
Joined
·
113 Posts
Discussion Starter · #9 ·
I just talked to them, they said I am the only person who has brought it up with them. They have the design but are catching up on backorders of other mounts. I told them I'll put out again on forums, again, that if an interest is shown, they can start producing. Randy Norman; [email protected] - owner; Paul Dorrian; [email protected] - Shipping manager
They lie lol talked to them two months ago about it and sent a email.
 

·
Registered
Joined
·
266 Posts
Randy from GPR emailed me this morning, supply delays have them way behind, they are hoping some R7 kits will be finished by the end of January.
 

·
Registered
Joined
·
113 Posts
Discussion Starter · #12 ·
Randy from GPR emailed me this morning, supply delays have them way behind, they are hoping some R7 kits will be finished by the end of January.
That is good news! Since earliest I can head to the track is early march
 
1 - 12 of 12 Posts
Top